ADU Builder · Studio City

ADU Construction in Studio City

A guest house for your parents, a studio steps from the back door, or a rental that pays part of the mortgage. Built on Studio City lots, permitted through LADBS.

★★★★★ 5.0 · rated 5.0 on Google CSLB #1045030 Licensed & Insured 2-Year Written Warranty Fixed Price In Writing

ADU Builder in Studio City

Built for Studio City lots, not from a template

Most Studio City lots have room for a second, smaller home in back. For plenty of homeowners here, that means an edit bay or writing studio you can walk to before coffee. For others, it's a guest house for parents or an income unit earning what a Studio City address commands. Either way, it has to fit the street it sits on.

Athenian Builders Group is a licensed California general contractor (CSLB #1045030) that designs and builds ADUs across Studio City. One team carries the drawings, the LADBS permits, and the construction, with a fixed price in writing, a firm timeline, and a 2-year workmanship warranty. See our full ADU construction services.

Permits

ADU permits in Studio City (City of LA)

Studio City is part of the City of Los Angeles, so ADU permits go through LADBS. We prepare the drawings, file the application, and manage every inspection through final approval.

Transparent Pricing

What an ADU costs in Studio City

Real 2026 ranges for the Los Angeles area, by ADU type. Size, site conditions, and finishes decide where you land. After a free on-site visit, you get a fixed, itemized price.

ADU TypeTypical SizeTypical Cost (2026)
Garage Conversion300–500 sq ft$100k – $180k
Junior ADU (JADU)up to 500 sq ft$90k – $160k
Attached ADU400–800 sq ft$180k – $320k
Detached New-Build500–1,200 sq ft$250k – $450k

Typical ranges for 2026, not quotes. Financing is available for qualified homeowners. See remodel financing options. Considering a smaller in-home unit? See our Junior ADU page.

750 sq ft

Estimated project cost

0,000 – 0,000
Instant ballpark. Book a free on-site visit for a firm, fixed price.

Why Athenian

One team, from permit to keys in Studio City

Most “ADU builders” are design shops or brokers who sub the construction out. We are a single self-performing team: we design it, pull the permits, and build it with our own crews. That means one point of contact, a fixed itemized price before we start, a firm timeline in writing, and a written 2-year workmanship warranty on everything we build in Studio City.

Questions

Studio City ADU FAQs

Do you build ADUs throughout Studio City?

Yes. We design and build detached ADUs, studios, and guest houses across Studio City, hillside lots included, and our own crews do the work.

Who issues ADU permits in Studio City?

Studio City is part of the City of Los Angeles, so LADBS issues the permits. We handle the whole process, application to final inspection.

How much does an ADU cost in Studio City?

Type and size drive the number. A garage conversion typically runs $100k–$180k, while a detached new-build lands between $250k–$450k. You approve a fixed, itemized price after a free on-site walkthrough.

How long does an ADU take to build?

Most of our ADUs finish in 3 to 5 months, plus LADBS review time before construction starts. You approve a firm timeline in writing before we break ground, so the schedule is never a guess.

Ready to build an ADU in Studio City?

Start with a free on-site feasibility visit. We walk the lot, then put a fixed, itemized price on your Studio City ADU, so you know the number before we ever break ground. Call (310) 857-2520.